JOB VACANCIES

Sophia's
Sophia's
  • Home
  • Sectors
    • Forestry
    • Fencing
    • Ecological
    • Invasive Weed Solutions
    • Landscaping
    • Newt Fencing
  • Capability Statement
  • GALLERY
    • GALLERY 1
    • GALLERY 2
    • GALLERY 3
  • Contact Us
  • More
    • Home
    • Sectors
      • Forestry
      • Fencing
      • Ecological
      • Invasive Weed Solutions
      • Landscaping
      • Newt Fencing
    • Capability Statement
    • GALLERY
      • GALLERY 1
      • GALLERY 2
      • GALLERY 3
    • Contact Us

  • Home
  • Sectors
    • Forestry
    • Fencing
    • Ecological
    • Invasive Weed Solutions
    • Landscaping
    • Newt Fencing
  • Capability Statement
  • GALLERY
    • GALLERY 1
    • GALLERY 2
    • GALLERY 3
  • Contact Us

Case Studies

Bat & Great Crested Newt Mitigation

Project Outline

Three Shires Ltd were responsible for Bat & Great Crested Newt Natural England Mitigation Licensing, Destructive Searches, Mitigation, Design, Working at Height, Asbestos, Roof Stripping for permitted refurbishment of a Natural England historical site and building. 


The development permitted the refurbishment of a Heritage Castle and extension of its building, incorporating three grade-listed outbuildings, in Warwickshire.
 

All buildings, including the castle, were occupied by multiple roosts (including hibernation, maternity colonies, and day roosts) for common and Soprano pipistrelle, brown long-eared and Myotis species.  



 

The Role of the Three Shires Ltd Ecologist 

Our Principal Ecologist acted as the Lead Ecologist and Accredited Agent and was present for all on-site works during the demolition phase.  



 

The Problem 


All buildings, including the castle, were occupied by multiple roosts (including hibernation, maternity colonies, and day roosts) for common and Soprano pipistrelle, brown long-eared and Myotis species.  



 

The Solution 


To obtain a European Protected Species Mitigation (EPSM) license from Natural England to allow the planned works to proceed, our Bat Ecologist/s designed extensive mitigation measures and agreed with the developer a phased approach to the works.  



 

The Outcome 


Roosts were preserved. Where this was not possible, suitable replacement roosts were built into the buildings, the maternity colonies were retained in situ and protected during the works. 


A Bat Hibernaculum was designed, which involved leaving an area of a basement closed off and undisturbed to ensure that conditions were cold, at a constant temperature and humidity. Suitable roosting crevices were provided by installing wooden wedge boards. 


A bespoke Bat loft was built to provide a summer roosting site for a maternity colony of brown long-eared Bats: this was constructed before works began to replace a roost nearby, which would have been lost during development. Numerous Bat boxes of several types were installed on trees around the site before works commenced. 



 

The role involved: 

  • conducting internal roost inspections  
  • implementing exclusion zones/working distances 
  • ensuring compliance with the license conditions: overseeing & ensuring compliance of the mitigation Bat loft creation and ensured that any Bats found during the demolition works (where our Principal Ecologist supervised all the works) were released safely within the Bat loft.  



 

Daily role: 

  • implementation of temporary roost exclusion devices across the buildings, working at height either in mobile elevated working platforms (MEWPs) or extensive scaffolding 
  • supervision of the soft stripping/demolition of roofs of all the buildings, many of which had asbestos present, as such, face kit testing, full head masks and training in the identification of asbestos in various forms.  



 

In addition: 

  • assisted as an accredited agent under the Great Crested Newt pitfall trapping, and translocation works, inclusive of the destructive hand search work activities. 

Key Statistics

Industry: Historical Parkland, Castle & Hotel Complex, Warwickshire

Contract Value:  £35.5 million
Start Date: March 2020
End Date: March 2021



Project Key Risk Areas: 

- Bat Roosts present

- Asbestos

- Working at Height

- Great Crested Newt presence

- Roof Stripping



Role of Three Shires Principle Ecologist:

- Acted as the Lead Ecologist and Accredited Agent

- Present for all on-site works during the demolition phase.


contact us

Three Shires Overview

Three Shires Ltd are specialist contractors to the Rail, Utilities, Construction and Civil Infrastructure sectors.


For over 25 years Three Shires Ltd has developed long standing relationships with the UK’s leading Construction Contractors, House Builders, Civil Engineers, Developers, Environmental and Ecological Consultants.

Company Information

  

- Privacy Policy    


- Cookie Policy


- Policies


- Certifications 


- Capability Statement

Contact Information

Contact Information


Three Shires Ltd 

Piper Hole Farm

Eastwell Road, Scalford

Leicestershire, LE14 4SS


Phone: 01664 444 604

Fax: 01664 444 605


Email us

Copyright © 2003 - 2026 Three Shires - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept