Galloper Wind farm was a Joint venture between RWE and SSE to construct on offshore wind farm off the cost of East Anglia, creating a renewable supply of up to 340MV of sustainable electricity.
Working directly for Galloper Wind Farm Limited, Three Shires Limited undertook various ecological contracting works at Greater Gabbard Substation.
Three Shires were appointed as Principal Contractor for the duration of works, taking responsibility for delivering a complex series of mitigation measures in an extremely safety critical environment.
Prior to commencing works Three Shires developed a highly detailed Safe System of Work to address the exceptionally challenging environment, which featured UXOs on-site, adjacent working to Sizewell Nuclear Power Station, underground and OHL services and adjacent working to HV substation all within complex consents framework.
Three Shires works included:
> Supply and installation of 3076 meters of Temporary Reptile Fencing
-------------------------------------------------------------------------------------------------------------------------
> Construction of 2 Hibernacula, Capped with Specialist Acidic Topsoil and Seeding
-------------------------------------------------------------------------------------------------------------------------
> 800 metres of Stock Fencing
-------------------------------------------------------------------------------------------------------------------------
> 4 no. access gates
-------------------------------------------------------------------------------------------------------------------------
> Extensive Destructive Search
-------------------------------------------------------------------------------------------------------------------------
> Climbing Bat Inspections
-------------------------------------------------------------------------------------------------------------------------
> Soft and Sectional Felling
-------------------------------------------------------------------------------------------------------------------------
> Relocation of Bat Features to Reatained Trees
-------------------------------------------------------------------------------------------------------------------------
> Timber Extraction
-------------------------------------------------------------------------------------------------------------------------
> Timber Marketing
-------------------------------------------------------------------------------------------------------------------------
> Site Management
Three Shires Ltd are specialist contractors to the Rail, Utilities, Construction and Civil Infrastructure sectors.
For over 25 years Three Shires Ltd has developed long standing relationships with the UK’s leading Construction Contractors, House Builders, Civil Engineers, Developers, Environmental and Ecological Consultants.
Three Shires Ltd
Piper Hole Farm
Eastwell Road, Scalford
Leicestershire, LE14 4SS
Phone: 01664 444 604
Fax: 01664 444 605